This Project is a huge success!
The Project of getting Well #4 On-line and connected into the Water System has been completed. A special thanks to Fulkerson Pump Service and Water Manager, Terry Patton.
The water we receive now is a "blend" of water from Well #4 and Well #5.
The Arsenic Level of this blended water is only 5.4/ppb, which is far below the EPA acceptable level of 10.0/ppb.
Stephen Fairman
President
No comments:
Post a Comment